<mark id="zphp9"></mark>


<font id="zphp9"></font><mark id="zphp9"><video id="zphp9"></video></mark>

<mark id="zphp9"><video id="zphp9"></video></mark>
<mark id="zphp9"></mark>

      全自動(dòng)涼茬機的使用方法

      發(fā)布于:2024-05-13 14:13:25  來(lái)源:http://www.zgfzdca.com

        全自動(dòng)涼茬機的使用方法

      Usage of fully automatic stubble cooling machine

        全自動(dòng)晾茬機是將攤晾、加漿、加曲、攪拌、卸料等工序一次性完成,與傳統工藝相比,大大降低勞動(dòng)強度,實(shí)現機械自動(dòng)化。裝有多個(gè)軸流風(fēng)機,通過(guò)風(fēng)量的調節,使高溫涼茬在輸送過(guò)程中降到規定的溫度,攤晾效果好,在攤晾過(guò)程中設置多個(gè)攪拌裝置,使涼茬在攤晾過(guò)程中松散、不易結坨,加漿、下曲均勻,數量可調節,通過(guò)裝置可將漿水、曲粉、糧茬攪拌均勻。

      The fully automatic stubble drying machine completes the processes of spreading, adding pulp, adding yeast, stirring, and unloading in one go. Compared with traditional processes, it greatly reduces labor intensity and achieves mechanical automation. Equipped with multiple axial flow fans, the air volume is adjusted to lower the high-temperature cold stubble to the specified temperature during transportation, resulting in good spreading effect. Multiple mixing devices are set up during the spreading process to make the cold stubble loose and less prone to clumping. The addition of slurry and downward bending are uniform, and the quantity can be adjusted. Through the device, the slurry, koji powder, and grain stubble can be evenly mixed.

        使用步驟:

      Usage steps:

        一、安裝前應查看全自動(dòng)晾茬機各部位,零件是否有松動(dòng)現象,如發(fā)現,需修理后方可安裝。

      1、 Before installation, check all parts of the fully automatic stubble drying machine for any looseness. If found, repair is required before installation.

        二、安裝時(shí),打茬機跑車(chē)輪與道軌間隙以打茬機與軌跡來(lái)回跑動(dòng)時(shí)為規范。

      2、 During installation, the gap between the running wheels of the stubble trimmer and the track is standardized when the stubble trimmer runs back and forth with the track.

        三、打茬機安裝結束后,需要行試工作五分鐘左右,查看各部位是否有雜音現象出現,如發(fā)現雜音應泊車(chē)檢修,待試工作正常后,方可投入正常生產(chǎn)運用。

      20231114111944480.jpg

      3、 After the installation of the stubble cutting machine is completed, it needs to be tested for about five minutes to check for any noise in various parts. If any noise is found, it should be parked for maintenance. Only after the test work is normal can it be put into normal production and use.

        四、運用過(guò)程中,應經(jīng)常留意有無(wú)異常動(dòng)靜,轟動(dòng)是否加大,如發(fā)現雜音應及時(shí)泊車(chē)檢修。

      4、 During use, regular attention should be paid to any abnormal movements and whether the noise increases. If any noise is found, the car should be parked for maintenance in a timely manner.

        五、打茬機投入運用后,應定期查看螺栓有無(wú)松動(dòng),零部件有無(wú)損壞,如發(fā)現應根據具體情況檢修或更換零部件。

      5、 After the stubble cutting machine is put into use, it should be regularly checked for loose bolts and damaged parts. If found, it should be repaired or replaced according to the specific situation.

        六、在運用過(guò)程中,注油部位應定期注油,一般每三個(gè)月注黃油一次,以確保打茬機各傳動(dòng)部位潤滑正常,減少磨損。

      6、 During use, the oil injection area should be regularly lubricated, usually with butter every three months, to ensure normal lubrication of all transmission parts of the stubble machine and reduce wear.

        七、全自動(dòng)晾茬機若長(cháng)時(shí)間停用從頭投入生產(chǎn)運用時(shí),要從頭進(jìn)行查看,并通過(guò)試車(chē)工作正常后再投入生產(chǎn)運用。

      7、 If the fully automatic stubble drying machine is stopped for a long time and put into production again, it should be checked from the beginning and put into production again after passing the test run and working normally.

        本文來(lái)自:全自動(dòng)涼茬機 更多的內容請點(diǎn)擊:http://www.zgfzdca.com 我們將會(huì )為您提問(wèn)的問(wèn)題提供一個(gè)滿(mǎn)意的服務(wù),歡迎您的來(lái)電!

      This article comes from: Fully automatic stubble cooler. For more information, please click: http://www.zgfzdca.com We will provide satisfactory service for the questions you ask. Welcome to call us!


      咨詢(xún)熱線(xiàn):
      0537-4556677

      欧美成人精品三级18禁网址,欧美黑人巨大硬猛性,人妻少妇精品无码专区吞精,国产十粉嫩十无套流白浆91